guides:lockdown

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
guides:lockdown [2019/03/14 21:36]
vnbruno [Phases]
guides:lockdown [2021/04/30 04:01] (current)
sjames5 specify ports for site-to-site VPN
Line 45: Line 45:
   * Planning/​Logistics   * Planning/​Logistics
       * Responsible for making a Google Calendar of dates and holding everyone accountable to those dates       * Responsible for making a Google Calendar of dates and holding everyone accountable to those dates
 +      * Post competition dates and invitation to competition debrief in Town Square channel
 +      * Post team leads and invitation to volunteer in Town Square channel
   * UB Policies (Newspaper, room assignments)   * UB Policies (Newspaper, room assignments)
       * Responsible for making sure we treat and competitors treat UB property with respect ​       * Responsible for making sure we treat and competitors treat UB property with respect ​
Line 241: Line 243:
 "A goal without a plan is just a wish." "A goal without a plan is just a wish."
  
-This is the most important phase. ​ Everything needs to be sorted out here.+^ Lame quotes by Aaron! Ha! 
 + 
 +**This is the most important phase. Everything needs to be sorted out here.** 
 + 
 +The goal here is to decide all of this in a meeting with the leaders of Lockdown
  
 Due Dates Due Dates
Line 278: Line 284:
 Setup Setup
    * Site 2 Site VPN    * Site 2 Site VPN
 +       * Top port on the machine (i.e. the on-board NIC)
 +       * Left port on the wall
    * The competitor rooms, make sure the laptops are tidy and connected and the room is generally clean    * The competitor rooms, make sure the laptops are tidy and connected and the room is generally clean
    * Prizes ​    * Prizes ​
  • guides/lockdown.1552599416.txt.gz
  • Last modified: 2019/03/14 21:36
  • by vnbruno