guides:lockdown_black_team

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision Both sides next revision
guides:lockdown_black_team [2020/05/02 10:20]
aibekzhy
guides:lockdown_black_team [2020/05/22 15:28]
aibekzhy [Post Deployment Checklist]
Line 64: Line 64:
   * Ensure you take a snapshot of the entire infrastructure after deploying your malware   * Ensure you take a snapshot of the entire infrastructure after deploying your malware
   * Manually login to every VM after the red team is done pre-staging. This ensures that everything is still operational,​ and in addition, it loads a lot of things from disk to memory, which ensures a smoother experience at the start of the competition. ​   * Manually login to every VM after the red team is done pre-staging. This ensures that everything is still operational,​ and in addition, it loads a lot of things from disk to memory, which ensures a smoother experience at the start of the competition. ​
-  * If the performance of VMs is very slow, try to remove any snapshot ​that you may need to remove+  * If the performance of VMs is very slow, try to lower the number of snapshots or use the snapshots ​that were created are no longer than a day before the competition.
  
  
  • guides/lockdown_black_team.txt
  • Last modified: 2021/04/27 02:57
  • by aibekzhy